In 1988, Applied Energy Services (AES) was constructing a 183 MW coal-fired power plant in Connecticut.
Comments following the original post on REDD-Monitor.org are archived here: https://archive.ph/F6pm6#selection-879.4-879.14
Comments following the original post on REDD-Monitor.org are archived here: https://archive.ph/F6pm6#selection-879.4-879.14